СК Паук > Наши работы > Assembly work > Installation banner of the Adidas store

Installation banner of the Adidas store

Object:

Barabashova
store "Adidas"

Area – 410 m2

Involved – 4 climbers

Deadline – 3 days

Completed work:

  • Installation of structures
  • Banner installation

Hanging a large advertising banner near the metro station Academician Barabashova. Advertising banner size of about 200 square meters. m, the duration of 4 hours, by three people. Outdoor advertising was hung in hot weather, drank 10 liters of water for three.