At the moment, the surface is being prepared, the water-jet cleaning of corrugated flooring from dust and other atmospheric pollution.
Since the place is filled with people from early hours, preparatory work had to be carried out in the evening of the day off, and the painting work early in the morning at 4:30 in the morning.
In order to optimize the process, our technician has invented a device for local protection of adjacent surfaces from paint ingress.
In general, the work was performed for 9 man hours.
3 hours autotower.
If you liked the material read - put it, help us to become better!
Work on the hydro-jet cleaning and painting of the facade. Photos. "Etoile". | СК Паук